LEVER HOIST (ROLLER CHAIN)

DO'S:

  • The operator must check the condition of the hoist before use, as described in the operating instructions.

  • INDEF recommend that all chains, ropes and slings used for pulling or lifting must be continually inspected for damage or wear.

  • Loads must be securely attached and properly balanced before a lift is made.

  • When lifting or pulling, care must be taken to ensure the load is clear of all obstacles

  • When lifting or pulling a load near to the rated capacity of the hoist, the operator must test the brake each time by moving the load a short distance and then stopping.

  • Perform load chain checks weekly

  • Check load hooks condition regularly. A hook that is cracked, bent or twisted must be replaced immediately.

  • Ensure the hook is correctly located with the safety catch in place

DON'TS:

  • Do not hoist any loads until safety is assured, especially related to use not described in the operating instructions. Do not allow the personnel to enter the area below suspended loads.

  • The operator must not engage in any practice which will divert his attention whilst operating the hoist. Do not use the hoist for lifting people.

  • Do not leave the hoist unattended with a suspended load.

  • Do not depend on the brake to suspend the load unless the operator is in attendance.

  • Never exceed the rated capacity (safe working load) of the hoist.

  • To prevent increased loads on the hoist, do not operate to maximum or minimum chain extensions

  • The unit is designed for operation by hand, do not use extension tubes, or legs to overload the unit.

  • Particular risks are encountered when using the 2 hoists to lift a single load. If possible, the practice is to be avoided. If not, ensure the load is within the rated capacity of the hoists and evenly balanced between the two. Proceed to raise the load with extreme caution.

  • Do not use outside its temperature range of -10 degree c to +40 degree c

  • The equipment is designed for use with static loads. Do not subject to severe vibration or shock loads

  • Do not carry out unauthorized modifications to the unit.

  • Do not use a faculty hoist. If any faults are discovered, the unit must be checked and repaired.